41.6 F
Muscatine
Sunday, April 18, 2021
More

    Oversized load moving through Muscatine on Friday (April 2)

    City of Muscatine
    City of Muscatinehttps://www.muscatineiowa.gov
    This content has been provided by the City of Muscatine via press release or other notification systems to Discover Muscatine. It is being re-published as a resource for the Muscatine community. All questions regarding this content should be directed to the City of Muscatine at 215 E Sycamore St or (563)264-1550

    Muscatine Living

    Granola Grab Going on Now!

    You have 3 hours starting right NOW to grab your box of .50 Hy-Vee Granola bars at your local...

    MTS – Ashley with the Team of Donate Life Blue & Green Day

    Good morning! Every time we update our driver’s license, they ask, “Would you like to be an organ donor?”...

    MTS – Ashley with Amy Hessel of the YMCA

    We all lip sync to our favorite songs, jam out in the car or shower but will YOU get...

    MUSCATINE, Iowa – Two oversized loads will be making their way through Muscatine on Friday, April 2, from the Norbert F. Beckey Bridge to Highway 22 using Park Avenue and the U.S. 61 Bypass.

     

    Oversize Load Ahead Graphic (PNG)Diamond Heavy Hauling has notified the City of Muscatine that a heavy load measuring 18-feet wide and 240-feet long will be coming through the Muscatine Park Avenue 4-to-3 Conversion Project between 10:45 a.m. and 11:15 a.m. on Friday, April 2.

     

    Drivers are urged to find alternate routes of travel as lane restrictions will be in place as the heavy load moves through Muscatine.

     

    “Normally we would not have loads this large moving through when we have construction activity underway,” Pat Lynch, Muscatine City Engineer, said. “Planning for this event started last year and the contractor for the Park Avenue Project will be assisting Muscatine public safety personnel and Muscatine staff in the movement of the load.”

     

    Diamond Heavy Hauling anticipates coming across the Mississippi River bridge (Highway 92) and then needing some time to articulate the right turn onto East 2nd Street before heading northbound on Park Avenue through the construction area. The heavy load will turn left onto U.S. 61 from the Park Avenue intersection and then right onto Highway 22 at the Cedar Street intersection.

     

    Illinois State Police will escort the heavy load to the Mississippi River bridge with Iowa State Police taking over to escort the load on the Iowa side of the river.

     

    A smaller wide load, a soil finisher measuring 14-feet by 25-feet will also be passing through Muscatine on Friday.

     

    Latest News

    1st Annual Sip & Shop Event to take place in Downtown Muscatine

    MUSCATINE, Iowa– Join us for the 1st Annual Sip & Shop event in Downtown Muscatine on Friday, May 7,...

    Get Discover Muscatine in Your Inbox

    More Articles Like This